The company has passed ISO 14001:2015 and ISO 9001:2015 certification,and has been recognized by many customers for its excellent quality.
The company's products are self-developed, and the country has issued a patent certificate
Manufacturers produce and sell, prices are transparent, no middlemen
With many years of production experience, the equipment is of good quality, the drawings are produced quickly, and the production and delivery are fast.
It is suitable for the pulse test of automobile fuel pipe, adopts the principle of servo hydraulic pulse, and solves the problems of inaccurate waveform control, low safety performance, and inability to automatically extinguish the fire in the prior art.
It aims at the self leakage of the test hose under positive pressure and negative pressure, and carries out micro pressure leakage detection for the test piece, so as to judge the qualification of the test piece product.
It is to improve the defect that the high-pressure oil pulse can not control the medium temperature in the past, so that the medium can completely circulate and flow in the pulse experiment. The pressure waveform, temperature and flow can be controlled in real time, and each channel can be controlled separately. The pressure and temperature of each channel can be detected. The performance of this kind of equipment is qualitatively improved by adopting the integrated mode of servo hydraulic pressure and control.
It is used to test the components of automobile cooling system. It is a comprehensive testing machine specially developed for the test pieces whose test medium is automobile coolant, low pulse pressure, high pulse frequency and large expansion. It adopts electro-hydraulic servo closed-loop control, the pressure waveform and test temperature can be adjusted and controlled, each circuit can be controlled separately, the flow can be adjusted automatically, and each circuit can be tested for pressure.
The entire inspection station contains basic vehicle inspection equipment, light detectors, exhaust gas detectors, etc., you can contact us for a detailed list.
Equipment installation We will arrange for professional personnel to carry out installation on site and training.
We will arrange personnel to conduct site survey in the early stage, only need to cooperate to provide information, we will have professional drawings.